Site Establishment / Early Works
Establish the initial project baseline and surrounding context.
Long-duration visual documentation for high-rise, commercial, residential, institutional, redevelopment and major refurbishment programmes.
A viewpoint that works during excavation can lose value as the structure rises. Planning therefore considers future height, cranes, neighbouring structures, façade works, access and the potential need for viewpoint relocation.

The visual record should evolve with the project rather than remain fixed to the assumptions made at mobilisation.
Establish the initial project baseline and surrounding context.
Record enabling works, excavation, foundation and below-ground progression.
Maintain visibility as the building gains height and project geometry changes.
Document external enclosure and visible building transformation.
Support selected milestone documentation as internal and external workstreams progress.
Record roads, landscaping, public realm and final site development where visible.
Capture major completion-stage milestones where included.
Preserve agreed project outputs and the final chronological record.
Project conditions influence viewpoint selection, access, continuity, reporting and the value of each visual record over time.
Useful coverage changes as the building rises or surrounding structures obstruct the original view.
Tower height, cranes and adjacent development influence long-term framing.
Structure, façade, M&E, fit-out and external works may progress simultaneously.
Installation and maintenance depend on contractor-controlled access and safety requirements.
Some programmes benefit from planned relocation to preserve meaningful coverage.
Visual continuity must be maintained across potentially multi-year construction programmes.
Capabilities are illustrative and remain subject to project assessment, final scope and formal agreement.
Primary fixed-view chronological capture for the agreed programme.
Additional viewpoints where one perspective cannot adequately represent the project.
Relocation where required to preserve coverage through changing project geometry.
Approved progress media for management or stakeholder use where included.
Authorised access to available imagery and agreed deliverables.
Additional visual capture may be separately assessed where relevant.

Building and property stakeholders often require repeatable visual access across long programmes without relying only on physical attendance.
Review available imagery across the project chronology.
Retrieve selected images where included.
Access agreed monthly or milestone media.
Keep approved outputs organised within the project arrangement.
Dashboard access is project-specific and does not represent certified progress measurement or conventional CCTV surveillance.
A useful construction record is not only a completion film. It should preserve the major physical transitions that matter to project teams and stakeholders.

Sivdio's contracted multi-year urban construction timelapse experience includes the TRX Kuala Lumpur development, with six deployed viewpoints across the 2015–2021 programme period.
View TRX reference →
Detailed system architecture and pricing follow qualification. Early review begins with the project programme and operating environment.
Share the location, programme duration, project type and intended reporting requirement for an initial suitability review.